In this space-age IT comparative piece, Gerhard Greef, consultant at operations management systems (OMS) supplier, Keops Isis, part of the JSE-listed Altech, paints an interesting and colourful analogy of the challenges facing companies when they install new systems, as well as providing a step-by-step check list.

Installing software and getting people to use it effectively are two different things as Captain Kirk and his crew of the Starship Enterprise find out. They identify some of the behavioural problems, how they manifest and develop a plan for the next time:

"As any rookie starship officer just out of the Academy will tell you, installation of a new software system requires the implementation of changes to the current system to improve productivity or efficiency. What these geniuses or champions of new software systems normally fail to mention is that it will not be all red dwarfs and roses. The change includes not only using a new software system, but also new methods and work practices. Initially, productivity and efficiency will more than likely go full reverse thrust, even with Mr. Spock in charge. Why is this so, and what should a Starship captain do to reduce the impact? The answer captain, must be out there, and its not boldly going where no man has gone before!

Captain Kirk, with his vast experience in human nature, says you must anticipate and be prepared for potential problems that may occur. A captain must be that he is asking people to do things differently. Unless they are involved early in the process, they may not understand what is required of them. People establish `Zones of Stability`.

These `zones` can be interpreted in many different ways. A captain might say things like `Scotty is a creature of habit`, `McCoy is accustomed to doing it this way` or `In Engineering we`ve always done it that way`. As commander, a captain is responsible for his crew accepting new ideas, for involving them and making them understand the changes that will take place and the benefits to them and others.

When installing a new system, you also need to be prepared for change. Problems can occur both in the technical and `how to` aspects of the change, and in the behavioural aspect. Spock will tell you that of the two, technical problems are easier to recognise and solve. The technical and `how to` aspects are by no means simple to resolve though, and are strongly interrelated with the behavioural aspects. If a captain takes responsibility for the behaviour of his people, if he starts to effectively steer their behaviour along constructive courses, only then can technical problems be resolved easily.

General behaviour on the part of officers, support personnel and crew will determine the time needed to work on the technical bugs normally found within a new system. Spock found that the installation uncovered problems that previously existed but were thought to have been resolved, or problems that weren`t discovered before the installation. An excerpt from his ships log reveals some of the problems uncovered by the new system:

`Large backlogs of work have been uncovered and nobody knows how these were not noticed before. Some officers even refuse to acknowledge that they actually do exist. Some sections fail to meet deadlines, creating problems for other sections that rely on their output. This is due to productivity differences that were not apparent before, and system usage and training inefficiency after installation. Some officers are also weaker in command, and where the old system hid this, the new system highlights it. The system also highlights the sections where Safety or quality is sub-standard, and officers and personnel alike obviously do not like having their weaknesses exposed. This in turn is leading to behavioural problems in officers and personnel`.

Captain Kirk was not impressed when he received this report, and he was really worried when he received the reports from McCoy and Sulu.

Reports from Dr. McCoy and Lt. Sulu revealed a number of support personnel and crew behavioural problems after the system installation. Sickbay visits and work apathy suddenly increased, personnel slowed down the work process as a reaction to the new system, not on an organised basis, but nevertheless contributing to the failure to meet objectives.

Personnel also became careless and produced at substandard safety and productivity levels, often opposing the new system and verbally expressing resentment of the new system. Starting to take notice of the effect of the system on his crew, Captain Kirk noticed changes in the effectiveness of his junior officers.

Due to nervousness or because they are operating with a new system, officers failed to follow or adhere to normal deadlines, procedures and work sequencing, and failed to react to unusual circumstances as they had previously done. Officers also temporarily forgot their responsibilities for safety and quality. For a reconnaissance vessel, this was obviously of major concern, and Kirk recorded how failure to fulfil their responsibilities was expressed.

Some officers are criticising the system or personnel rather than actively participating in the correction of problems, thus contributing to low morale. Others are unwilling to participate or support the installation, and rather than adopting the system and as their own, refer to it as "Kirk`s baby". Even some of the science officers, chosen for their logic and scientific approach to problems, are failing to analyse or determine the facts before jumping to conclusions. Some of the weaker officers have expressed their own weakness by fighting the system, its principles and basic data, rather than doing what the system calls for, taking what appears to be the least distasteful way out.

This is often done deliberately to show personnel that the officer is on their side.

Generally, most officers are blaming anything that goes wrong on the new system, using the system as a scapegoat for current problems and in some cases even things that have occurred in the past. It has been reported that problems that have occurred have not been discussed within the section with superior officers, but have been voiced to other sections and officers, increasing distrust and animosity between crew members, sections and officers. These sometimes minor issues have thus, due to action not being taken by superior officers who are unaware of them, become major problems.

So how did Kirk resolve the situation? What did he do to make the new system a success? To understand the remedy and be able to prevent the same thing from happening again, Kirk found it necessary to investigate and understand the pre-installation misconceptions of the officers. An installation post-mortem was done and Kirk and his team uncovered some of these misconceptions.

The senior officers of all sections were involved in the system design and planning. They thus did not deem it necessary to involve the lower level personnel that were going to use the system. The "tricks of the trade" used by the personnel to make the old system work were not taken into account. As a result the new system had most of the same deficiencies as the old system.

The senior officers thought that all their sub-ordinates understood the benefits of the system for the ship, but it appeared that some of the officers were not completely committed to the change required to make the new system work. This was especially true for officers not directly benefiting from the installation, but whose sections had to provide inputs into the system on a regular basis. As a result, the effort they spent on making the system work was directly proportional to the perceived benefit to their section.

As the system design and development required long and exhausting hours of work, the officers accepted that their workload would decrease as soon as the system was installed. They thought that they would be able to take a well-deserved rest a week after implementation. What they did not take into account is the disruption and accompanying reduction in productivity as result of the installation. It took them a while to recognise their mistake, losing the opportunity to decrease the effect of the installation. Spock depicted this with the following graph, once again confirming Kirk`s belief that he is too logical for his own good.

Sulu related to the graph immediately, commenting that the team from Omega-5 that helped to design, configure and install the system left the Enterprise soon after the installation. It would have helped to have them around for a longer period, as they knew the system and would have provided additional hands and guidance. As the installation meant changes in work procedures and made things easier for personnel, they assumed the system would do everything. They were not ready to adapt to the changed practises.

The officers themselves assumed the same thing, and were not ready to follow up on the functions not addressed by the system. The credits saved by sending the Omega-5 team back early did not even start to make up for in subsequent productivity losses. They were not around to guide the system users and officers about their responsibilities in terms of the system use, and how to interact with the system. Sulu felt that the system was not used properly from the start and any system is only as good as its usage.

Captain Kirk thought this is a very valid point, and made a mental note, "If the system is not used properly, the benefits will not be there, sounds logical!". The officers accepted that personnel will follow orders and use the system immediately, unfortunately this did not happen. Even after training, system usage was low, until officers became actively involved. Dr. McCoy explained why this happened.

During any installation junior officers and personnel will have to be taken through 3 Phases. The first thing that must be achieved is "". During this phase an officer needs to instil the discipline to adopt the new procedures and methods totally and completely. Lots of re-explaining will be required and it may take considerable time and sometimes even disciplinary action before compliance is achieved. Personnel will usually merely comply, often mechanically, and as quickly as possible.

This is fine, as compliance is necessary before the junior officer or person can move onto the next phase "Understanding"

Once personnel are complying, their officer can teach them to understand the value of the information obtained from the system. Once personnel understand the meaning and effect of what they are doing, they progress to the third and final phase "Usage"

Now that personnel are recording meaningful and comprehensive information, they can start to use it in their day-to-day activities. Usage involves reacting to problems that cause safety risks, lost time and process inefficiencies, events can now be anticipated and often prevented. Crises will become less frequent, as personnel are now empowered with the information they need to combat possible crises.

Captain Kirk thought Dr McCoy was pushing it a bit, but the others thought he was an extremely clever fellow, well, except Scotty who thought it was a lot of psycho-babble. So, to answer the questions, let us summarise what Captain Kirk and his team have learned:

  • Involve and consult as wide as possible,

  • Be aware of the possible behavioural and technical problems, and implement plans to reduce their impact,

  • Publish system benefits as widely as possible,

  • Obtain commitment from the whole team to make the system work,

  • Implement measuring indicators as early warning of potential problems, and use them later for publicising the system successes,

  • Investigate and address all problems and concerns as soon as possible, do not let them persist,

  • Increase supervisory effort with installation, do not sit back and wait,

  • Address behavioural problems immediately,

  • Enforce compliance from the start, do not accept procrastination or other excuses, and

  • Keep the installation team together for as long as possible, in the long run, it will be less expensive.

Experience in various system installation- and change management projects have shown that the problems experienced by the Enterprise are not unique, and will manifest themselves in various guises in different companies. In order to guarantee the success of any installation or system implementation, one needs to ensure that change management plans are part of the project deliverable."